ASTM WK90761
Third party inspection and testing of samples of gaskets gathered during these inspections requires additional time for testing of the samples by their labs or other labs used by the third party to conduct the testing. A reasonable time for these tests is suggested to be 60 days. This change is not intended to change any of the current requirements of the manufacturer.
Date Initiated: 05-14-2024
Technical Contact: William LeVan
Item: 002
Ballot: A04 (24-02)
Status: Negative Votes Need Resolution