Data Points
Q: How does sample size impact Shewhart Individuals control chart reliability? A. Click HERE to download the full article and read the answer.  
Industry Sectors:

Data Points
Q: How does sample size impact Shewhart individuals control chart reliability? A. Click HERE to download the full article and read the answer.   
Industry Sectors:

Data Points
The Benefits of E691 Q: ASTM International standard E691, Practice for Conducting an Interlaboratory Study to Determine the Precision of a Test Method, recommends a particular design, but other ASTM committees suggest alternative designs. What are… more
Industry Sectors:

Data Points
  Q: What do we mean by the capability of a process? A. Click HERE to download the full article and read the answer.  
Industry Sectors:

Data Points
Q: What is a prediction interval? A. Click HERE to dowload the article and read the answer.
Industry Sectors:

Data Points
Q: What is a tolerance interval? A. Click HERE to download the full article and read the answer.  
Industry Sectors:

Data Points
Q: What is the purpose of multiple or redundant inspections? A. Click HERE to download the full article and read the answer.  
Industry Sectors:

Data Points
  Q. How can I combine the results of two samples that are statistically alike based on hypothesis testing when the original data are now unavailable? A. Click HERE to download the full article and read the answer.  
Industry Sectors:

Data Points
Q: What is precision and how is it interpreted in the context of ASTM test methods? A. Click HERE to download the full article and read the answer.  
Industry Sectors:

Data Points
  Q. I suspect that my data contain more than one outlier. Is there a preferred technique to use to isolate them? A. Click HERE to download the full article and read the answer.  
Industry Sectors: